Ömer Işıkman
|
|
Interest Areas
Project Management
Construction Management for the Hydraulic Structures
Design of Hydraulic Structures
|
|
Curriculum Vitae | |
E-mail: omer.isikman {at} mng.com | |
Links: enve.metu.edu.tr | |
Phone: +90-312-436-3000 Fax: +90-312-447-5282 |
Education
- MSc in Environmental Engineering, Middle East Technical University - Turkey, 1985-1988
- BSc in Environmental Engineering, Middle East Technical University - Turkey, 1979-1985
Interest Areas
- Design of Hydraulic structures, Water & Waste Water Treatment PlantsWater Treatment Plants
- Design of Infrastructure Systems, water distribution, waste water collection
- Design of Pumping Station and the force mains
- Management of the Construction Projects
Membership in Professional Societies
- Chamber of Environmental Engineers, Turkey
Positions Held
- 2017 - : Member of Execution Committee, MAPA-ÖZALTIN Joint Venture,
- 2016 - : Member of Execution Committee, MAPA-YAPI YAPI Joint Venture,
- 2007 – 2008 : General Manager, GÜNAL Co. Inc. Dubai
- 2004 - 2016 : Project Manager, MAPA Co. Inc.
- 1995 – 2004 : Assistant Project Manager, MAPA Co. Inc
- 1990 – 1995 : Site Engineer, Site Manager, Project Manager, ACK Co. Inc.
- 1988 – 1990 : Assistant Design Engineer, Design Engineer, ACK – SİMAŞ LTD
- 1985 – 1988 : Research Assistant, METU, Environmental Engineering Department
Projects and Positions
Design Engineer
- Kilis City wastewater treatment plant design – Assistant Design Engineer
- Diyarbakır City water treatment plant design – Assistant Design Engineer
- Ankara Bakay-II sewerage system design – Assistant Design Engineer
- Kayseri City sewerage & Pumping Station design – Assistant Design Engineer
- Konya I Stage sewerage system design – Assistant Design Engineer
- Beyşehir City water treatment plant design – Design Engineer
- Konya wastewater treatment design – Design Engineer
- Yoğunoluk & İlküvez water treatment plants design – Design Engineer
- Tekel Winery wastewater treatment plant design – Design Engineer
- Barbaros water treatment plant design – Design Engineer
- Sağlamtaş water treatment plant design – Design Engineer
Site Engineer
- Konya City sewerage system construction
- Kayseri City sewerage construction
- Beyşehir City water treatment plant construction
Site Manager
- Yoğunoluk & İlküvez water treatment plant construction
- Tekel Winery waste water treatment plant construction
Project Manager
- Sağlamtaş water treatment plant construction
- Barboros water treatment plant construction
Senior Project Manager
- İzmir Tahtalı water treatment plant & pumping station construction - 525.000 m3/day capacity
- Gaziantep City wastewater treatment plant construction - 1.000.000 population, 200.000 m3/day
- Gaziantep City stage II water treatment plant & pumping stations construction - 120.000 m3/day
- Gaziantep City stage III water treatment plant construction - 160.000 m3/day
- İstanbul New Emirli Water Treatment Plant Construction - 510.000 m3/day
- Diyarbakır City water treatment plant construction - 255.000 m3/day
Project Manager
- Gorna Oriahovitza waste water treatment plant construction – Bulgaria – ISPA From. 2004-2006 - 60.000 m3/day
General Manager MNG- GÜNAL Dubai Branch Office from: 2007 to: 2008
Project Manager From:2008-2014
- Setif - Hodna System East Water Transmission & pumping station Constructions, Republic of Algeria
5 pumping station construction, each capacity 7,5 m3/sec, average Hm: 250 mWC
Construction of Sub-stations 220-60 KV
Construction of 4 Sub-Stations 60-10 KV
58 km. 60 KV Energy Transmission Line Construction
Pipeline Construction with 1.800 mm, 2.000 mm and 2.500 mm Total Length is 41.200 Meters
Project Manager From: 2014-
- Beni Haroun – Mila PK9 Tunnel Construction, Republic of Algeria
Total Length: 4.100 meters
Excavation Diameter: 6,10 meters
Pipeline Length: 4.220 Meters
Pipe Diameter:2.500 mm
Member of Execution committee MAPA-OZALTIN JV, Kingdom of Jordan
- Arab Wadi Water System II – Irbid
Construction of Water Intake System with Low Head Water Pumps
Construction of Water Treatment Plant with 30 M m3/year
Construction of Pumping Stations; PS0, PS1, PS2 and PS3
Construction of Water Transfer pipeline with 1.200 mm Diameter
Member of Execution committee MAPA-YAPI YAPI
- New Emirli Water Treatment Plant Construction II Stage – İstanbul
Construction of Water Treatment Plant with 550.000 m3/day treated water