Ömer Işıkman
 
Interest Areas
Project Management
Construction Management for the Hydraulic Structures
Design of Hydraulic Structures
Curriculum Vitae 
E-mail: omer.isikman {at} mng.com
Links: enve.metu.edu.tr
Phone: +90-312-436-3000  Fax: +90-312-447-5282

Education

  • MSc in Environmental Engineering, Middle East Technical University - Turkey, 1985-1988
  • BSc in Environmental Engineering, Middle East Technical University - Turkey, 1979-1985

Interest Areas

  • Design of Hydraulic structures, Water & Waste Water Treatment PlantsWater Treatment Plants
  • Design of Infrastructure Systems, water distribution, waste water collection
  • Design of Pumping Station and the force mains
  • Management of the Construction Projects

Membership in Professional Societies

  • Chamber of Environmental Engineers, Turkey

Positions Held

  • 2017 - : Member of Execution Committee, MAPA-ÖZALTIN Joint Venture,
  • 2016 - : Member of Execution Committee, MAPA-YAPI YAPI Joint Venture,
  • 2007 – 2008 : General Manager, GÜNAL Co. Inc. Dubai
  • 2004 - 2016 : Project Manager, MAPA Co. Inc.
  • 1995 – 2004 : Assistant Project Manager, MAPA Co. Inc
  • 1990 – 1995 : Site Engineer, Site Manager, Project Manager, ACK Co. Inc.
  • 1988 – 1990 : Assistant Design Engineer, Design Engineer, ACK – SİMAŞ LTD
  • 1985 – 1988 : Research Assistant, METU, Environmental Engineering Department

Projects and Positions

Design Engineer

  • Kilis City wastewater treatment plant design – Assistant Design Engineer
  • Diyarbakır City water treatment plant design – Assistant Design Engineer
  • Ankara Bakay-II sewerage system design – Assistant Design Engineer
  • Kayseri City sewerage & Pumping Station design – Assistant Design Engineer
  • Konya I Stage sewerage system design – Assistant Design Engineer
  • Beyşehir City water treatment plant design – Design Engineer
  • Konya wastewater treatment design – Design Engineer
  • Yoğunoluk & İlküvez water treatment plants design – Design Engineer
  • Tekel Winery wastewater treatment plant design – Design Engineer
  • Barbaros water treatment plant design – Design Engineer
  • Sağlamtaş water treatment plant design – Design Engineer

Site Engineer

  • Konya City sewerage system construction
  • Kayseri City sewerage construction
  • Beyşehir City water treatment plant construction

Site Manager

  • Yoğunoluk & İlküvez water treatment plant construction
  • Tekel Winery waste water treatment plant construction

Project Manager

  • Sağlamtaş water treatment plant construction
  • Barboros water treatment plant construction

Senior Project Manager

  • İzmir Tahtalı water treatment plant & pumping station construction - 525.000 m3/day capacity
  • Gaziantep City wastewater treatment plant construction - 1.000.000 population, 200.000 m3/day
  • Gaziantep City stage II water treatment plant & pumping stations construction - 120.000 m3/day
  • Gaziantep City stage III water treatment plant construction - 160.000 m3/day
  • İstanbul New Emirli Water Treatment Plant Construction - 510.000 m3/day
  • Diyarbakır City water treatment plant construction - 255.000 m3/day

Project Manager

  • Gorna Oriahovitza waste water treatment plant construction – Bulgaria – ISPA From. 2004-2006 - 60.000 m3/day

General Manager MNG- GÜNAL Dubai Branch Office from: 2007 to: 2008

Project Manager From:2008-2014

  • Setif - Hodna System East Water Transmission & pumping station Constructions, Republic of Algeria
    5 pumping station construction, each capacity 7,5 m3/sec, average Hm: 250 mWC
    Construction of Sub-stations 220-60 KV
    Construction of 4 Sub-Stations 60-10 KV
    58 km. 60 KV Energy Transmission Line Construction
    Pipeline Construction with 1.800 mm, 2.000 mm and 2.500 mm Total Length is 41.200 Meters

Project Manager From: 2014-

  • Beni Haroun – Mila PK9 Tunnel Construction, Republic of Algeria
    Total Length: 4.100 meters
    Excavation Diameter: 6,10 meters
    Pipeline Length: 4.220 Meters
    Pipe Diameter:2.500 mm

Member of Execution committee MAPA-OZALTIN JV, Kingdom of Jordan

  • Arab Wadi Water System II – Irbid
    Construction of Water Intake System with Low Head Water Pumps
    Construction of Water Treatment Plant with 30 M m3/year
    Construction of Pumping Stations; PS0, PS1, PS2 and PS3
    Construction of Water Transfer pipeline with 1.200 mm Diameter

Member of Execution committee MAPA-YAPI YAPI

  • New Emirli Water Treatment Plant Construction II Stage – İstanbul
    Construction of Water Treatment Plant with 550.000 m3/day treated water


Last Updated:
27/05/2019 - 11:32