Skip to main content

Eng. M.S. Ömer Işıkman

Ömer Işıkman

Ömer Işıkman

Part-Time Instructor
E-mail: omer.isikman@mapa.group
Phone: +90-312-210-5867   
Office: Z-06

Education

  • MSc in Environmental Engineering, Middle East Technical University - Turkey, 1985-1988
  • BSc in Environmental Engineering, Middle East Technical University - Turkey, 1979-1985

Interest Areas

  • Design of Hydraulic structures, Water & Waste Water Treatment PlantsWater Treatment Plants
  • Design of Infrastructure Systems, water distribution, waste water collection
  • Design of Pumping Station and the force mains
  • Management of the Construction Projects

Membership in Professional Societies

  • Chamber of Environmental Engineers, Turkey

Positions Held

  • 2017 - : Member of Execution Committee, MAPA-ÖZALTIN Joint Venture,
  • 2016 - : Member of Execution Committee, MAPA-YAPI YAPI Joint Venture,
  • 2007 – 2008 : General Manager, GÜNAL Co. Inc. Dubai
  • 2004 - 2016 : Project Manager, MAPA Co. Inc.
  • 1995 – 2004 : Assistant Project Manager, MAPA Co. Inc
  • 1990 – 1995 : Site Engineer, Site Manager, Project Manager, ACK Co. Inc.
  • 1988 – 1990 : Assistant Design Engineer, Design Engineer, ACK – SİMAŞ LTD
  • 1985 – 1988 : Research Assistant, METU, Environmental Engineering Department

Projects and Positions

Design Engineer

  1. Kilis City wastewater treatment plant design – Assistant Design Engineer
  2. Diyarbakır City water treatment plant design – Assistant Design Engineer
  3. Ankara Bakay-II sewerage system design – Assistant Design Engineer
  4. Kayseri City sewerage & Pumping Station design – Assistant Design Engineer
  5. Konya I Stage sewerage system design – Assistant Design Engineer
  6. Beyşehir City water treatment plant design – Design Engineer
  7. Konya wastewater treatment design – Design Engineer
  8. Yoğunoluk & İlküvez water treatment plants design – Design Engineer
  9. Tekel Winery wastewater treatment plant design – Design Engineer
  10. Barbaros water treatment plant design – Design Engineer
  11. Sağlamtaş water treatment plant design – Design Engineer

Site Engineer

  1. Konya City sewerage system construction
  2. Kayseri City sewerage construction
  3. Beyşehir City water treatment plant construction

Site Manager

  1. Yoğunoluk & İlküvez water treatment plant construction
  2. Tekel Winery waste water treatment plant construction

Project Manager

  1. Sağlamtaş water treatment plant construction
  2. Barboros water treatment plant construction

Senior Project Manager

  1. İzmir Tahtalı water treatment plant & pumping station construction - 525.000 m3/day capacity
  2. Gaziantep City wastewater treatment plant construction - 1.000.000 population, 200.000 m3/day
  3. Gaziantep City stage II water treatment plant & pumping stations construction - 120.000 m3/day
  4. Gaziantep City stage III water treatment plant construction - 160.000 m3/day
  5. İstanbul New Emirli Water Treatment Plant Construction - 510.000 m3/day
  6. Diyarbakır City water treatment plant construction - 255.000 m3/day

Project Manager

  1. Gorna Oriahovitza waste water treatment plant construction – Bulgaria – ISPA From. 2004-2006 - 60.000 m3/day
General Manager MNG- GÜNAL Dubai Branch Office from: 2007 to: 2008

Project Manager From: 2008-2014

  1. Setif - Hodna System East Water Transmission & pumping station Constructions, Republic of Algeria 5 pumping station construction, each capacity 7,5 m3/sec, average Hm: 250 mWC Construction of Sub-stations 220-60 KV Construction of 4 Sub-Stations 60-10 KV 58 km. 60 KV Energy Transmission Line Construction Pipeline Construction with 1.800 mm, 2.000 mm and 2.500 mm Total Length is 41.200 Meters

Project Manager From: 2014-

  1. Beni Haroun – Mila PK9 Tunnel Construction, Republic of Algeria Total Length: 4.100 meters Excavation Diameter: 6,10 meters Pipeline Length: 4.220 Meters Pipe Diameter:2.500 mm

Member of Execution committee MAPA-OZALTIN JV, Kingdom of Jordan

  1. Arab Wadi Water System II – Irbid Construction of Water Intake System with Low Head Water Pumps Construction of Water Treatment Plant with 30 M m3/year Construction of Pumping Stations; PS0, PS1, PS2 and PS3 Construction of Water Transfer pipeline with 1.200 mm Diameter

Member of Execution committee MAPA-YAPI YAPI

  1. New Emirli Water Treatment Plant Construction II Stage – İstanbul Construction of Water Treatment Plant with 550.000 m3/day treated water
Last updated